Monday, August 8, 2011


Since June, I've spent as many weekends up at the cabin as I can. Through the first part of July, I worked on getting the electrical rough in done. I had to do a lot of studying to figure out how to do the wiring up to code. After a couple of weekends, the rough in was done, but we were right in the midst of Minnesota's government shut down, so I couldn't get it inspected. Finally, the government got their act together, and the inspector came by. After a just a few minutes and a few questions, the inspection resulted in a pass with no corrections.


At that point, I was able to go ahead and put in the insulation and sheet rock. One weekend, Jim came up and helped get the countertop and sink in.

For the past two weekends, I've been doing the insulation and sheet rock - just Luke and me. It's tough work especially with the heat. At this point, nearly all the sheet rock is hung (but not taped). That really makes things feel more finished.

I'll only have one more weekend this summer to work on the cabin before I'll need to stick around home to wait for the arrival of our boy. It's been a big year!